[torqueusers] load balancing

Mahmood Naderan nt_mahmood at yahoo.com
Thu Jun 14 11:53:39 MDT 2012


Hi
Assume there are two nodes:
w1 np=12
w2 np=12

When I submit 8 jobs, all 8 jobs are run on w2. It is more desirable to have two 50% load on each node rather than a 100% load on one. The 8 jobs are all single threaded not MPI. Is there any way to define such policy?

 Thanks
// Naderan *Mahmood;


More information about the torqueusers mailing list