Hi, I have a 16-node cluster with each node a SMP Xeon box. Is there a way in torque to submit a job which will get scheduled on 2 CPUs within the same node? Currently all 2-CPU jobs (-l nodes=2) get submitted on different nodes. Thanks. Amitay. -- Everyone is a genius at least once a year. A real genius has his ideas closer together.